Tradewoods were involved in the development at Canary Wharf for almost 2 years before the project commenced. Liaising with the designers and firming up final specifications with the architectural team, Tradewoods assisted in drawing up a tight specification for Tradewoods Classic Walnut 3-Strip to be laid over a heated subfloor.

Several alternatives were examined before the final choice of hardwood floor covering was made, but it was decided that Tradewoods Classic Walnut 3-Strip gave the appartments a classic feel whilst complimenting the comtemporary and moderm build.

Over 2500mē of flooring was installed in total, with the whole project being completed two weeks ahead of schedule.